[Working Documents] Services Programme Area
Title | File | |
---|---|---|
1 |
WMO-No.702, SPA_ETWS_general_01 Guide to Wave Analysis and Forecasting 1998, Second Edition |
|
2 |
WMO-No.259 WMO Sea-Ice Nomenclature, volumes I, II and III This document provides snapshot of the WMO Sea Ice Nomenclature (WMO No. 259, volume 1 – Terminology and Codes, Volume II – Illustrated Glossary and III – International System of Sea-Ice Symbols... |
|
3 |
WMO-No. 574 Sea-Ice Information Services in the World The Sea Ice Information Services in the World (WMO-No.574) is intended to provide to mariners and other users information on best practices in sea ice services available world-wide and by this formall... |
|
4 |
SWFDP Severe Weather Forecasting Demonstration Project - Extension to Include Marine Forecasting Aspects |
|
5 |
SSW-W_Inf Information for participants |
|
6 |
SPA_SCG_meeting_SCG04_Doc.7.1, SCG-IV-Doc.7.1 Preparation for JCOMM-III - Documentation for the session, including draft recommendations This document provides detailed information regarding the planning for the JCOMM-III session, in particular the preparation of documentation. |
|
7 |
SPA_SCG_meeting_SCG04_Doc.5.6, SCG-IV-Doc.5.6 Capacity Building Progress/Activity Report This document provides information on Capacity Building (CB) activities since MAN-VI. It also presents the outcome of the 7th session of the JCOMM Management Committee (Melbourne, Australia, December ... |
|
8 |
SPA_SCG_meeting_SCG04_Doc.5.2, SCG-IV-Doc.5.2 Marine Accident Emergency Support |
|
9 |
SPA_SCG_meeting_SCG04_Doc.2.0, SCG-IV-Doc.2 Guidance and requirements |
|
10 |
SPA_SCG_meeting_SCG04_Doc.1.3, SCG-IV-doc.1.3 Timetable |
|
11 |
SPA_SCG_meeting_SCG04_Doc.1.2(2), SCG-IV-Doc.1.2(2) Annotated provisional agenda |
|
12 |
SPA_SCG_meeting_SCG04_Doc.1.2(1), SCG-IV-Doc.1.2(1) Provisional agenda |
|
13 |
SPA_MSS MMMS 2009 Results of the JCOMM survey on monitoring the effectiveness of the marine meteorological and oceanographic information produced and transmitted by NMHSs |
|
14 |
SPA_MAN_meeting_SCG04_Doc.3.0, SCG-IV-doc.3 Outcomes of and actions arising from the seventh session of the JCOMM Management Committee (Melbourne, Australia, December 2008) This document contains a summary of the major outcomes of and actions arising from the seventh session of the JCOMM Management Committee (Melbourne, Australia, December 2008). |
|
15 |
SPA_ETWS_verification201809 September 2018 Wave forecasts verification against in-situ data August to October 2018 |
|
16 |
SPA_ETWS_verification201808 August 2018 |
|
17 |
SPA_ETWS_verification201807 July 2018 |
|
18 |
SPA_ETWS_verification201806 June 2018 |
|
19 |
SPA_ETWS_verification201805 May 2018 Wave forecast verification against in-situ data April-June 2018 |
|
20 |
SPA_ETWS_verification201804 April 2018 Wave Forecast verification against in-situ data, March to May 2018 |
|
21 |
SPA_ETWS_verification201803 March 2018 Wave Forecast verification against in-situ data, February to April 2018 |
|
22 |
SPA_ETWS_verification201802 February 2018 Wave Forecast inter-comparison with in-situ observations, January to March 2018 |
|
23 |
SPA_ETWS_verification201801 January 2018 Wave Forecast Verification against in-situ observations December 2017 to February 2018 |
|
24 |
SPA_ETWS_verification201712 December 2017 Wave Forecast system inter-comparison against in-situ data November 2017 to January 2018 |
|
25 |
SPA_ETWS_verification201711 November 2017 Wave Forecast inter-comparison against in-situ data for September to December 2017 |
|
26 |
SPA_ETWS_verification201710 October 2017 Wave forecast system inter-comparison against in-situ data for September to November 2017 |
|
27 |
SPA_ETWS_verification201709 September 2017 Wave forecast inter-comparison with in-situ data August to October 2017 |
|
28 |
SPA_ETWS_verification201708 August 2017 Wave forecast verifications against in-situ observations, July to September 2017 |
|
29 |
SPA_ETWS_verification201707 July 2017 Wave forecast inter-comparison against in-situ observations, June-August 2017 |
|
30 |
SPA_ETWS_verification201706 June 2017 Wave forecast system inter-comparison with in-situ observations, May-July 2017 |
|
31 |
SPA_ETWS_verification201705 May 2016 Inter-comparison of wave forecast systems against in-situ data, April to June 2017 |
|
32 |
SPA_ETWS_verification201704 April 2017 Wave forecast system inter-comparison against in-situ observations for March to May 2017 |
|
33 |
SPA_ETWS_verification201702 February 2017 Wave forecast system inter-comparison for January to March 2017 |
|
34 |
SPA_ETWS_verification2017 Annual ending December 2017 Wave Forecast system inter-comparison against in-situ data from January to December 2017. |
|
35 |
SPA_ETWS_verification201612 December 2016 Inter-comparison of wave forecasting system against in-situ data from November 2016 to January 2017 |
|
36 |
SPA_ETWS_verification201611 November 2016 Inter-comparison of wave forecast system against in-situ observations from October to December 2016 |
|
37 |
SPA_ETWS_verification201610 October 2016 Inter-comparison of wave forecast system against in-situ observations from September to November 2016 |
|
38 |
SPA_ETWS_verification201607 July 2016 Inter-comparison of wave forecasting system with in-situ data, June to August 2016. |
|
39 |
SPA_ETWS_verification201606 June 2016 Inter-comparison of wave forecasting system with in-situ data, May to July 2016 |
|
40 |
SPA_ETWS_verification201605 May 2016 Inter-comparison of wave forecasting system with in-situ data, April to June 2016 |
|
41 |
SPA_ETWS_verification201604 April 2016 Inter-comparison of wave forecasting system with in-situ data, March to May 2016 |
|
42 |
SPA_ETWS_verification201603 March 2016 Inter-comparison of wave forecasting system with in-situ data, February to April 2016 |
|
43 |
SPA_ETWS_verification201602 February 2016 Inter-comparison of wave forecasting system with in-situ data, January to March 2016 |
|
44 |
SPA_ETWS_verification201601 January 2016 Inter-comparison of wave forecasting system with in-situ data fro December to March 2016 |
|
45 |
SPA_ETWS_verification2016 Annual ending December 2016 Inter-comparison of wave forecast system against in-situ observations for 2016 |
|
46 |
SPA_ETWS_verification201512 December 2015 Inter-comparison of wave forecasting systems against in-situ observations, November 2015 to January 2016 |
|
47 |
SPA_ETWS_verification201511 November 2015 Inter-comparison of wave forecasting systems against in-situ observations, October to December 2015 |
|
48 |
SPA_ETWS_verification201510 October 2015 Inter-comparison of wave forecasting systems against in-situ observations, September to November 2015 |
|
49 |
SPA_ETWS_verification201509 September 2015 Wave forecast inter-comparison against in-situ data, August to Otober 2015 |
|
50 |
SPA_ETWS_verification201508 August 2015 Wave forecast inter-comparison against in-situ data, July-September 2015 |
|
51 |
SPA_ETWS_verification201507 July 2015 Inter-comparison of operational wave forecasting systems against in-situ observations, June to August 2015 |
|
52 |
SPA_ETWS_verification201506 June 2015 Inter-comparison of operational wave forecasting systems against in-situ observations, May to July 2015 |
|
53 |
SPA_ETWS_verification201505 May 2015 Inter-comparison of operational wave forecasting system against in-situ data, March to June 2015 |
|
54 |
SPA_ETWS_verification201504 April 2015 Inter-comparison of operational wave forecasting system against in-situ observations, March to May 2015 |
|
55 |
SPA_ETWS_verification201502 February 2015 Inter-comparison of operational wave forecasting system against in-situ data, January to March 2015. |
|
56 |
SPA_ETWS_verification201501_201512 Annual ending December 2015 |
|
57 |
SPA_ETWS_verification201501 January 2015 Inter-comparison of operational wave forecasting systems against in-situ data, December 2014 to February 2015 |
|
58 |
SPA_ETWS_verification201412 December 2014 Inter-comparison of operational wave forecasting system against in-situ observations, November 2014 to January 2015 |
|
59 |
SPA_ETWS_verification201411 November 2014 Inter-comparison of wave forecasting systems against in-situ observations, October to December 2014. |
|
60 |
SPA_ETWS_verification201410 October 2014 Inter-comparison of operational wave forecasting systems against in-situ observations, September to November 2014. |
|
61 |
SPA_ETWS_verification201409 September 2014 Inter-comparison of operational wave forecasting systems against in-situ observations, August to October 2014. |
|
62 |
SPA_ETWS_verification201408 August 2014 Inter-comparison of operational wave forecasting systems against in-situ observations, July to September 2014. |
|
63 |
SPA_ETWS_verification201407 July 2014 Intercomparison of operational wave forecasting systems against in-situ observations, June to August 2014 |
|
64 |
SPA_ETWS_verification201405 May 2014 |
|
65 |
SPA_ETWS_verification201404 April 2014 Inter-comparison of wave forecasting systems against in-situ data, March to May 2014. |
|
66 |
SPA_ETWS_verification201403 March 2014 Inter-comparison of wave forecasting systems against in-situ data, February to April 2014. |
|
67 |
SPA_ETWS_verification201402 February 2014 Inter-comparison of wave forecasting systems against in-situ data, January to March 2014. |
|
68 |
SPA_ETWS_verification201401_201412 Annual ending December 2014 Inter-comparison of wave operational forecasting systems against in-situ observations, January to December 2014. |
|
69 |
SPA_ETWS_verification201312 December 2013 Inter-comparison of operational wave forecasting systems against in-situ observations, November 2013 to January 2014 |
|
70 |
SPA_ETWS_verification201311 November 2013 Inter-comparison of operational wave forecasting systems againt in-situ data |
|
71 |
SPA_ETWS_verification201310_201409 Annual ending September 2014 |
|
72 |
SPA_ETWS_verification201310 October 2013 Inter-comparison of operational wave forecasting system against in-situ observations, September to November 2013. |
|
73 |
SPA_ETWS_verification201309 September 2013 Inter-comparison of operational wave forecasting systems |
|
74 |
SPA_ETWS_verification201308 August 2013 Inter-comparison of operational wave forecasting systems |
|
75 |
SPA_ETWS_verification201307 July 2013 Inter-comparison of operational wave forecasting systems against in-situ observations, June to August 2013 |
|
76 |
SPA_ETWS_verification201306 June 2013 Inter-comparison of operational wave forecasting systems against in-situ observations, May to July 2013. |
|
77 |
SPA_ETWS_verification201305 May 2013 Inter-comparison of wave forecasting systems |
|
78 |
SPA_ETWS_verification201303 March 2013 Inter-comparison of operational wave forecasting systems against in-situ observations |
|
79 |
SPA_ETWS_verification201302 February 2013 Inter-comparison of operational wave forecasting systems against in-situ observations, January to March 2013 |
|
80 |
SPA_ETWS_verification201301 January 2013 Inter-comparison of operational wave forecasting system against in-situ observations, December 2012 to February 2013 |
|
81 |
SPA_ETWS_verification201212 December 2012 Inter-comparison of operational wve forecasting systems against in-situ observations, November 2012 to January 2013 |
|
82 |
SPA_ETWS_verification201211 November 2012 Inter-comparison of operational wave forecasting systems |
|
83 |
SPA_ETWS_verification201210 October 2012 Inter-comparison of operational wave forecasting systems |
|
84 |
SPA_ETWS_verification201209 September 2012 Inter-comparison of operational wave forecasts |
|
85 |
SPA_ETWS_verification201208 August 2012 Inter-comparison of operational wave forecasting systems against in-situ observations, July to September 2012 |
|
86 |
SPA_ETWS_verification201207 July 2012 Inter-comparison of operational wave model |
|
87 |
SPA_ETWS_verification201207 July 2012 Inter-comparison of operational wave models |
|
88 |
SPA_ETWS_verification201206 June 2012 Inter-comparison of wave forecasting system against in-situ observations, May to July 2012. |
|
89 |
SPA_ETWS_verification201205 May 2012 Inter-comparison of operational wave forecasting systems |
|
90 |
SPA_ETWS_verification201204 April 2012 Inter-comparison of operational wave forecasting systems against in-situ observations, March-May 2012 |
|
91 |
SPA_ETWS_verification201203 March 2012 Inter-comparison of operational wave forecasting systems against in-situ observations, February to April 2012 |
|
92 |
SPA_ETWS_verification201202 February 2012 Inter-comparison of operational wave forecasting systems against in-situ observations, January to March 2012 |
|
93 |
SPA_ETWS_verification201201 January 2012 Inter-comparison of operational wave forecasting systems against in-situ observations, December 2011 - February 2012 |
|
94 |
SPA_ETWS_verification201112 December 2011 Inter-comparison of operational wave forecasting systems against in-situ observations, from November 2011 to January 2012 |
|
95 |
SPA_ETWS_verification201111 November 2011 Inter-comparison of operational wave forecasting system against in-situ observations |
|
96 |
SPA_ETWS_verification201110 October 2011 Inter-comparison of operational wave forecasting system against in-situ observations from September to November 2011. |
|
97 |
SPA_ETWS_verification201109 September 2011 Inter-comparison of operational wave forecasting systems against in-situ observations |
|
98 |
SPA_ETWS_verification201105 May 2011 Inter-comparison of operational wave forecasting systems against in-situ observations, April to June 2011. |
|
99 |
SPA_ETWS_verification201102 February 2011 Inter-comparison of operational wave forecasting systems against in-situ observations from January to March 2011 |
|
100 |
SPA_ETWS_verification201101 January 2011 Inter-comparison of operational wave forecasting systems against in-situ observations, December 2010 to February 2011. |
|
101 |
SPA_ETWS_verification201012 December 2010 Inter-comparison of operational wave forecasting systems |
|
102 |
SPA_ETWS_verification201011 November 2010 Inter-comparison of operational wave forecasting systems against in-situ observations, October to December 2010 |
|
103 |
SPA_ETWS_verification201010 October 2010 Inter-comparison of operational wave forecasting systems against in-situ observations, September to November 2010 |
|
104 |
SPA_ETWS_verification201009 September 2010 Inter-comparison of operational wave forecasting systems against in-situ observations, August to September 2010. |
|
105 |
SPA_ETWS_verification201008 August 2010 Inter-comparison of operational wave forecasting systems against in-situ observations. |
|
106 |
SPA_ETWS_verification201007 July 2010 Inter-comparison of operational wave forecasting systems against in-situ observations. |
|
107 |
SPA_ETWS_verification201006 June 2010 Inter-comparison of operational wave forecasting systems against in-situ observations. |
|
108 |
SPA_ETWS_verification201005 May 2010 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI April to June 2010 |
|
109 |
SPA_ETWS_verification201004 April 2010 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI March to May 2010 |
|
110 |
SPA_ETWS_verification201004 April 2011 Inter-comparison of operational wave forecasting systems against in-situ observations, March to May 2011. |
|
111 |
SPA_ETWS_verification201003 March 2010 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI February to April 2010. |
|
112 |
SPA_ETWS_verification201002 February 2010 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI January to March 2010 |
|
113 |
SPA_ETWS_verification201001 January2010 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI December 2009 to Februar... |
|
114 |
SPA_ETWS_verification200912 December2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI November 2009 to January... |
|
115 |
SPA_ETWS_verification200911 November2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado, DMI October 2009 to December... |
|
116 |
SPA_ETWS_verification200910 October2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado September 2009 to November 20... |
|
117 |
SPA_ETWS_verification200909 September2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado August 2009 to October 2009 |
|
118 |
SPA_ETWS_verification200908 August2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado July 2009 to September 2009 |
|
119 |
SPA_ETWS_verification200907 July2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado June 2009 to August 2009 |
|
120 |
SPA_ETWS_verification200906 June2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado May 2009 to July 2009 |
|
121 |
SPA_ETWS_verification200905 May2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado April 2009 to June 2009 |
|
122 |
SPA_ETWS_verification200904 April2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado March 2009 to May 2009 |
|
123 |
SPA_ETWS_verification200903 March2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado February 2009 to April 2009 |
|
124 |
SPA_ETWS_verification200902 February2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado January 2009 to March 2009 |
|
125 |
SPA_ETWS_verification200901 January2009 Intercomparison of operational wave forecasting systems against buoys: data from ECMWF, MetOffice, FNMOC, MSC, NCEP, MeteoFrance, DWD, BoM, JMA, KMA, Puerto del Estado December 2008 to February 200... |
|
126 |
SPA_ETWS_SSW-W05_ppt1, SSW-W_ppt1 Coordinating Operational Oceanography and Marine Meteorology |
|
127 |
SPA_ETWS_SSW-W05_Doc6.5, SSW-W_6.5 BoM Operational Storm Surge forecast procedures in NE Australia |
|
128 |
SPA_ETWS_SSW-W05_Doc6.4, SSW-W_6.4 BoM Operational Storm Surge forecast procedures in NW Australia |
|
129 |
SPA_ETWS_SSW-W05_Doc6.3, SSW-W_6.3 JMA Storm Surge Model |
|
130 |
SPA_ETWS_SSW-W05_Doc6.2, SSW-W_6.2 BoM Storm Surge Model |
|
131 |
SPA_ETWS_SSW-W05_Doc6.1, SSW-W_6.1 IIT Storm Surge Model |
|
132 |
SPA_ETWS_SSW-W05_Doc4.1, SSW-W_4.1 Consensus Forecasts of Modelled Wave Parameters |
|
133 |
SPA_ETWS_SSW-W05_Doc3.3-4.2, SSW-W_3.3_4.2 Access to Existing Data and Products |
|
134 |
SPA_ETWS_SSW-W05_Doc3.2, SSW-W_3.2 Measuring, Modelling and Forecasting Waves (met.no) |
|
135 |
SPA_ETWS_SSW-W05_Doc3.1, SSW-W_3.1 BoM Wave Models and Products |
|
136 |
SPA_ETWS_SSW-W05_Doc2.1, SSW-W_2.1 Coordinating Operational Oceanography and Marine Meteorology |
|
137 |
SPA_ETWS_SSW-W05_Doc2.0, SSWS Storm Surge Watch Scheme |
|
138 |
SPA_ETWS_SSW-W05_Doc1.0, SSW-W_Doc1 Severe Weather Forecasting Demonstration Project |
|
139 |
SPA_ETWS_SSW-W05_9.2, SSW-W_9.2 The societal impacts of Storm Surge and the Options and Opportunities for Mitigation |
|
140 |
SPA_ETWS_SSW-W05_9.2, SSW-W_9.2 Interaction with Disaster Management Agencies in the context of ATWS |
|
141 |
SPA_ETWS_SSW-W05_9.1, SSW-W_9.1 Assessment of Tsunami Warning and Mitigation Systems in Pacific Islands Countries - Identifying Regional and Country Specific Needs |
|
142 |
SPA_ETWS_meeting_WW97 WAVES97 proceeding Towards a systematic verification of operational wave models |
|
143 |
SPA_ETWS_meeting_WW10_02 Paper 10th workshop Paper presented at the 10th International Workshop on Wave Hindcasting and Forecasting in Hawaii |
|
144 |
SPA_ETWS_meeting_WW10_01 Paper 10th workshop Paper presented at the 10th International Workshop on Wave Hindcasting and Forecasting in Hawaii |
|
145 |
SPA_ETWS_meeting_SCG04_Doc.5.3, SCG-IV-Doc.5.3 ETWS Progress/Activity Report and proposed future work plan This document provides information on the ongoing activities, achievements and priorities of the Expert Team on Wind Waves and Storm Surges (ETWS) since JCOMM-II including suggestions for the future w... |
|
146 |
SPA_ETWS_meeting_ESA ESA Storm Surge Project |
|
147 |
SPA_ETWS_general_WWsat WW-sat Use of satellite data in wave models |
|
148 |
SPA_ETWS_general_WWmodel, WW-model Wave models |
|
149 |
SPA_ETWS_general_WWmeasured, WW-measured Measured wave data |
|
150 |
SPA_ETWS_general_SS_model01 Storm Surge models |
|
151 |
SPA_ETWS_general_03 VERIFICATION OF OPERATIONAL GLOBAL AND REGIONAL WAVE FORECASTING SYSTEMS AGAINST MEASUREMENTS FROM MOORED BUOYS |
|
152 |
SPA_ETWS_ETWS3_01 logistics information for ETWS-III |
|
153 |
SPA_ETSI_general_IICWG01 Ice Information Services: Socio-Economic-requirements The Updated year 2007 version of the Innternational Ice Charting Working Group (IICWG ) Socio-Economic-requirements |
|
154 |
SPA_ETOOFS_GOV GODAE OceanView |
|
155 |
SPA_ETOFS_meeting_SCG04_Doc.5.5, SCG-IV-doc.5.5 Ocean Forecasting Systems (OFS) |
|
156 |
SPA_ETMSS_meeting_SCG04_Doc.5.1, SCG-IV-Doc.5.1 ETMSS Progress/Activity Report and proposed future work plan This document provides information on the ongoing activities, achievements and priorities of the Expert Team on Maritime Safety Services (ETMSS) since JCOMM-II including suggestions for the future wor... |
|
157 |
SPA_ESTI_meeting_SCG04_Doc.5.4, SCG-IV-Doc.5.4 ETSI Progress/Activity Report and proposed future work plan This document provides information on the ongoing activities, achievements and priorities of the Expert Team on Sea Ice (ETSI) since JCOMM-II including suggestions for the future work programme and ... |
|
158 |
SPA-wp-1.7 SPA workplan 2006-2009 v1.7 |
|
159 |
SFSPA_ETWS_CIFDP Project Plan of the JCOMM/CHy Coastal Inundation Forecasting Demonstration Project This CIFDP Project Plan presents the objectives and activities planned in the framework of the CIFDP |
|
160 |
OPA_WIGOS_meeting_RMIC01_Barbados, RMIC1-Barbados Barbados |
|
161 |
MSC.1/Circ.1310 Joint IMO/IHO/WMO Manual on Maritime Safety Information (MSI) 2009 Edition (effective 1 January 2011) |
|
162 |
MHAZ JCOMM contributions to multi-hazard EWS |
|
163 |
JTA-34-Doc-9 National Reports JTA-34 National Reports Compilation of Country Reports on Argos related national activities during the last intersessional (2013-14) |
|
164 |
JCOMM-TR-064-CIFDP-IP-rev2015 CIFDP Implementation Plan 2015 Rev |
|
165 |
JCOMM-TR-058, Extreme value analysis: still water level 2011 edition |
|
166 |
JCOMM-TR-057, Extreme value analysis: wave data 2011 edition |
|
167 |
JCOMM-TR-055, WMO/TD-No. 1581, WCRP Informal Report No. 22/2011, SPA_ETWS_COWCLIP_01 Final Report: WCRP-JCOMM Workshop on Coordinated Global Wave Climate Projections (COWCLIP) Geneva, Switzerland, 11 - 13 April 2011 |
|
168 |
JCOMM-TR-047, WMO/TD-NO.1466, IOC-NO.208, IOC Workshop Report No.208 Final report of the JCOMM Technical Workshop on Wave Measurements from Buoys (2 - 3 October 2008, New York) New York City, USA, 2-3 October 2008 |
|
169 |
JCOMM-TR-033, WMO/TD-NO.1357, SPA_ETWS_general_02 Techniques and Benefits of Satellite Data and Wave Models 2006 edition |
|
170 |
JCOMM-TR-024, WMO/TD-NO.1215, SPA_ETSI_general_SIM04 Ice Chart Colour Code Standard May 2014 edition (revision 1) |
|
171 |
JCOMM-TR-009, WMO/TD-NO.1041, SPA_ETWS_general_04 Estimation of Extreme Wind Wave Heights 2000 edition |
|
172 |
JCOMM-MR-109, SPA_ETMSS_ETOOFS_MPERSS_meeting_01 Ad hoc Task Team meeting on JCOMM Coordination for Marine Environmental Emergency Responses Vienna, Austria, 1 August 2013 |
|
173 |
JCOMM-MR-105, SPA_ETWS_CIFDP_011 Meeting on System Design for Coastal Inundation Forecasting Demonstration Project for Bangladesh (CIFDP-B) Dhaka, Bangladesh, 28-30 May 2013 |
|
174 |
JCOMM-MR-102, SPA_ETOOFS_meeting_ETOOFS4_Final Fourth Session of JCOMM Expert Team on Operational Ocean Forecasting Systems College Park, USA, 25-29 March 2013 |
|
175 |
JCOMM-MR-089, SPA_SCG_meeting_SCG6_01 Services and Forecasting Systems Coordination Group (SCG), 6th session Seoul, Republic of Korea, 8-11 November 2011 |
|
176 |
JCOMM-MR-081, SPA_ETWS_CIFDP_006 Report of the JCOMM/CHy Coastal Inundation Forecasting Demonstration Project (CIFDP) Second Steering Group Meeting Geneva, Switzerland, 20 â?? 22 September 2010 |
|
177 |
JCOMM-MR-080, SPA_ETWS_report_ETWS3_Final Final Report, Third Session of the Expert Team on Wind Waves and Storm Surges Toronto, Canada, 18-22 May 2010 |
|
178 |
JCOMM-MR-076, SPA_SCG_meeting_SCG5_01 Services and Forecasting Systems Coordination Group (SCG), 5th session Melbourne, Australia, 7-8 May 2010 |
|
179 |
JCOMM-MR-065, SPA_SCG_meeting_SCG4_01 Services Programme Area Coordination Group, 4th session Geneva, Switzerland, 11-13 March 2009 |
|
180 |
JCOMM-MR-064, TT-MSI, SPA_ETMSS_meeting_ETMSSTT_01 JCOMM/ETMSS Task Team on Maritime Safety Services, 1st session Geneva, Switzerland, 9-11 March 2009 |
|
181 |
JCOMM-MR-051, SPA_ETSI_meeting_ETSI3_07 JCOMM Expert Team on Sea Ice (ETSI), 3rd session; Steering Group for the Global Digital Sea Ice Data Bank (GDSIDB), 11th session Geneva, Switzerland, 28-31 March 2007 |
|
182 |
JCOMM-MR-049, SPA_ETWS_meeting_ETWS2_01 JCOMM Expert Team on Wind Waves and Storm Surges (ETWS), 2nd session Geneva, Switzerland, 20-24 March 2007 |
|
183 |
JCOMM-MR-047, SPA_ETMSS_meeting_ETMAES1_01 JCOMM Expert Team on Marine Accident Emergency Support (ETMAES), 1st session Angra dos Reis, Brazil, 29-31 January 2007 |
|
184 |
JCOMM-MR-046, SPA_ETMSS_meeting_ETMSS2_01 JCOMM Expert Team on Maritime Safety Services (ETMSS), 2nd session Angra dos Reis, Brazil, 24-27 January 2007 |
|
185 |
JCOMM-MR-044, SPA_SCG_meeting_SCG3_01 Services Programme Area Coordination Group, 3rd session Exeter, United Kingdom, 7-10 November 2006 |
|
186 |
JCOMM-MR-038, SPA_ETWS_meeting_ETWSguide_01 Expert Meeting on the Development of the JCOMM Guide to Storm Surge Forecasting Geneva, Switzerland 8-10 February 2006 |
|
187 |
JCOMM-MR-030, SPA_SCG_meeting_SCG2_01 Services Programme Area Coordination Group (SCG), 2nd session Toulouse, France, 19-21 May 2004 |
|
188 |
JCOMM-MR-028, SPA_ETSI_meeting_ETSI2_01, GDSIDB-10 JCOMM Expert Team on Sea Ice (ETSI), 2nd Session, Steering Group for the Global Digital Sea Ice Data Bank (GDSIDB), 10th Session Hamburg, Germany, 15-17 April 2004 |
|
189 |
JCOMM-MR-022, SPA_ETWS_meeting_ETWS1_01 Expert Team on Wind Waves and Storm Surges (ETWS), 1st session Halifax, Canada, 11-14 June 2003 |
|
190 |
JCOMM-4/Doc.8.5 [Final] Future Priority for the Services and Forecasting Systems Programme Area |
|
191 |
JCOMM-4/Doc.8.4 [Final] Quality Management |
|
192 |
IOC-WR-239 2nd Advisory Workshop on enhancing forecasting capabilities for North Indian Ocean Storm Surges |
|
193 |
IOC-WR-223 Advisory Workshop on enhancing forecasting capabilities for North Indian Ocean Storm Surges 14-17 July 2009, New Delhi, India |
|
194 |
ETMSS3_Doc1.2(2) Annotated Provisional Agenda |
|
195 |
ETMSS3-Doc-1.2(1) Provisional Agenda |
|
196 |
CIFDP-I CIFDP-I-RA5 Side meeting |
|
197 |
CIFDP-I CIFDP Framework |
|
198 |
CIFDP-I CIFDP-I-DNA |
|
199 |
CIFDP-I CIFDP Presentation Oct 2014 |
|
200 |
CIFDP-I CIFDP perjanjian |
|
201 |
CIFDP-I CIF Indonesia |
|
202 |
558highseasv3 558 High Seas chapter version 3 |
|
203 |
, SPA_ETMSS_meeting_MSSW_01 Final Report, Maritime Safety Services Enhancement Workshop Melbourne, Australia, 3-6 May 2010 |
|
204 |
(discontinued) WMO-TD-0957, MMROA-REPORT-43, Proceedings of the International Workshop on Digitization and Preparation of Historical Marine Data and Metadata |
|
205 | Reports by the Members of the ETSI - Add. 1 | |
206 | ETSI-III/GDSIDB-XI Appendix to the Ice Objects Catalogue document | |
207 | ETSI-III & GDSIDB-XI Recommendations for future changes for sea ice coding standards | |
208 | ETSI-III & GDSIDB-XI IPY Activities - doc. 2.10(1), Rev. 1 | |
209 | ETSI-III & GDSIDB-XI Preliminary Report | |
210 | ETSI-III & GDSIDB-XI Final Report Draft | |
211 | USA National Ice Center SIGRID-3 sample for 2008.01.12-18 | |
212 |
Ice Analysts Workshop Juneâ??2008 - draft agenda
12-17 June 2008 Rostock, Germany |
|
213 | IAW-2008 registrat.. | |
214 |
Coordinating Global Ocean Wave Climate Projections
The IPCC AR4 recognized that insufficient projections of wave climate were available to assess the effects climate change will have on erosion of the world’s coasts. At present, considerable researc... |
|
215 | Regional Association V Storm Surge Watch Scheme Action Team Meeting | |
216 | Tropical Cyclone Programme, WMO: Storm Surge Watch Scheme and Storm Surge Warning Services | |
217 | WMO Hydrology and Water Resources Programme : Integrated Flood Management concept and coastal flooding | |
218 | UNESCO/IOC Pilot Project on Enhancing Regional Capabilities for Coastal Hazards Forecasting | |
219 | Deltares Flood Early Warning System (Delft-FEWS) | |
220 | WMO Disaster Risk Reduction Programme: Caribbean Regional Programme in Multi-Hazards Early Warning System with National Capacity Development | |
221 | U.S. Army Corps of Engineers (USACE): Surge Forecasting, Risk Assessment and the Effects of Rivers | |
222 | UNESCO/IOC Global coordination of end-to-end regional tsunami early warning system | |
223 | Report of the CIFDP-I and follow-up | |
224 |
Survey Questionnaire to Assess Forecasting and Observing Capacities of the National Meteorological, Hydrological and Oceanographic Services to support Multi-Hazard Early Warning Systems
This Survey Questionnaire has been developed by WMO Disaster Risk Reduction Programme in preparation of the Technical Meeting for Strengthening Regional Cooperation to Support Forecasting with Multi-H... |
|
225 | SSWW6 Item 2 : Workshop opening presentation, WMO - Oceans | |
226 | SSWW6 Item 3 : Ocean Wave Forecasting, ECMWF | |
227 | SSWW6 Item 3, Marine Forecasting at the National Hurricane Center (USA) | |
228 | SSW-W6 Item 3: Meteorological Service of Canada Wind and Waves Models and Products | |
229 | SSW-W6 Item 5 : Storm Surges Forecating at the National Hurricane Center (USA) | |
230 | Summary of the Workshop for Storm Surges and Waves Forecasting, Santo DOmingo, Dominican Republic , 21-26 February | |
231 |
Summary of the Workshop for Storm Surges and Waves Forecasting, Santo Domingo, Dominican Republic , 21-26 February 2011
Summary of the discussions and recommendations of the SSW-W6 |
|
232 |
Summary of Comments Ver. 2 of draft 558
a summary of comments on the draft manual 558 for review/discussion. |
|
233 |
558_Vol_I_en_2012edition_highseas_Version3
Draft version 3 of the Services for the High Seas in Manual 558 |
|
234 |
Strawman_558_v2_working
A working document providing the revised outline/organization proposed for Manual 558. |
|
235 | 558 coastal chapter version 2 | |
236 | 558 coastal chapter v1 - summary of comments | |
237 | SAR chapter v1 | |
238 | 558 Intro v2 | |
239 | 558 WWNWS support V1 | |
240 | 558 MPERSS chapter v1 | |
241 | 558 training v1 | |
242 | CIFDP Technical Review | |
243 | CIFDP-I-Model flow | |
244 | Prex CIFDP | |
245 | Case study of flood and coastal inundation | |
246 | CIFDP Dissemination | |
247 | CIFDP FEWS | |
248 | CIFDP-I models edit | |
249 | CIFDP Technical Review | |
250 | CIFDP-I Project Plan | |
251 | NCA | |
252 | Paparan Kalak | |
253 | CIFDP-I User requirement plan | |
254 | CIFDP Activity Plan | |
255 | NCA draft | |
256 | CIFDP Overview | |
257 | CIFDP-C_Project Planning | |
258 | Data Requiriments | |
259 | EQUIPO DE COORDINACION NACIONAL CIFPD-C_REV | |
260 | WWMIWS-1_Aug2018_METAREA_V-Brazil | |
261 | WWMIWS-1_Aug2018_METAREA_VI-Argentina | |
262 | WWMIWS-1_Aug2018_METAREA_VIIIS-Mauritius | |
263 | WWMIWS-1_Aug2018_METAREA_VII-SouthAfrica | |
264 | WWMIWS-1 Committee photo | |
265 | CIFDP-C SUMMARY FOR PSG-8_VS | |
266 | CIFDP-F SUMMARY FOR PSG-8_VS | |
267 |
Guide to Wave Analysis and Forecasting
This document is coming soon (2019 edition) |
|
268 | Draft: Guide to Wave Analysis and Forecasting (2019) |